Kingfa HR-527A

About
Kingfa HR-527A是一种丙烯腈丁二烯苯乙烯(ABS)材料,。 该产品在亚太地区或北美洲有供货,加工方式为:注射成型。 Kingfa HR-527A的主要特性有: 阻燃/额定火焰 耐热 Kingfa HR-527A的典型应用领域为:汽车行业&&

Product Description
SupplierKingfa
GenericABS
Material StatusCommercial: Active
FeaturesHeat Resistance, Good,HB
AvailabilitysNorth America,Asia Pacific
Process MethodsInjection Molding

Technical Data
PHYSICALNominal valueUnitTest method
Density1.05g/cm³ASTM D792
Melt Flow Rate
220℃,10.0kg12g/10minASTM D1238
Shrinkage rate
MD:23℃0.40 to 0.60%ASTM D955

IMPACTNominal valueUnitTest method
Impact strength of cantilever beam notchASTM D256
23℃,3.2mm200J/m
23℃,6.4mm160J/m

THERMALNominal valueUnitTest method
Hot deformation temperatureASTM D648
0.45 MPa, unannealed, 6.4 mm102
1.8 MPa, unannealed, 6.4 mm94.0
Vicat Softening Temp
112ASTM D1525 5
103ASTM D1525 6

Electrical performanceNominal valueUnitTest method
Volume resistivity1.0E+16ohms·cmASTM D257
Dielectric strength23kV/mmASTM D149

FLAME CHARACTERISTICSNominal valueUnitTest method
Flame retardant levelUL 94
1.50 mmHB
3.20 mmHB

MECHANICALNominal valueUnitTest method
Rockwell hardness
R-level106ASTM D785
tensile strength46.0MPaASTM D638
Tensile strain
fracture20%ASTM D638
Bending modulus2500MPaASTM D790
bending strength70.0MPaASTM D790

Process Conditions
injectionNominal valueUnitTest method
Drying temperature80.0 to 90.0°C
Drying time2.0 to 4.0hr
Barrel rear temperature180 to 205°C
Barrel middle temperature205 to 230°C
Barrel front temperature215 to 240°C
Processing (melt) temperature220 to 245°C
Mold temperature30.0 to 60.0°C
Injection speed慢to中等
Back pressure0.00 to 0.0100MPa

Notes
【 Disclaimer 】
Guangzhou Soliao Information Technology Co., Ltd. reserves all rights. The information in this data table was obtained from the manufacturer of the material on soliao.com. Soliao.com makes every effort to ensure the accuracy of this data. However, the search company does not assume any responsibility for the uncertainty and consequences caused to users by these data values and suggestions, and strongly recommends verifying the data values with the material supplier before the final selection of materials.