Celstran® PP-GF30-02 AD 3019

About
30% long glass fiber reinforced polypropylene – UV stabilized&&

Product Description
SupplierCelanese
GenericPP not specified
Material StatusCommercial: Active
FeaturesWeather resistance is good
AvailabilitysAfrica & Middle East ,North America,Latin America,Asia Pacific,Europe

Technical Data
PHYSICALNominal valueUnitTest method
Density1.12g/cm³ASTM D792
Density1.12g/cm³ISO 1183

MECHANICALNominal valueUnitTest method
Tensile modulus ASTM D638
-40℃8690MPaASTM D638
23℃6410MPaASTM D638
93℃3790MPaASTM D638
Tensile modulus6550MPaISO 527-2/1A/1
tensile strength ASTM D638
fracture100MPaISO 527-2/1A/5
Fracture, -40 ℃141MPaASTM D638
Fracture, 23 ℃108MPaASTM D638
Fracture, 93 ℃66.9MPaASTM D638
Tensile strain ASTM D638
fracture2.1%ISO 527-2/1A/5
Fracture, -40 ℃2.1%ASTM D638
Fracture, 23 ℃2.4%ASTM D638
Fracture, 93 ℃2.8%ASTM D638
Bending modulus
23℃6500MPaISO 178
bending strength
23℃170MPaISO 178

IMPACTNominal valueUnitTest method
Charpy Notched Impact Strength
23℃19kJ/m²ISO 179/1eA

THERMALNominal valueUnitTest method
Hot deformation temperature
1.8 MPa, unannealed149ASTM D648
1.8 MPa, unannealed157ISO 75-2/A

Process Conditions
injectionNominal valueUnitTest method
Drying temperature90 to 100°C
Drying time2.0hr
Recommended maximum moisture content0.20%
Barrel rear temperature200 to 210°C
Barrel middle temperature210 to 220°C
Barrel front temperature220 to 230°C
Nozzle temperature230 to 240°C
Processing (melt) temperature230 to 240°C
Mold temperature40 to 70°C

Notes
1. Typical properties: these are not to be construed as specifications.
【 Disclaimer 】
Guangzhou Soliao Information Technology Co., Ltd. reserves all rights. The information in this data table was obtained from the manufacturer of the material on soliao.com. Soliao.com makes every effort to ensure the accuracy of this data. However, the search company does not assume any responsibility for the uncertainty and consequences caused to users by these data values and suggestions, and strongly recommends verifying the data values with the material supplier before the final selection of materials.