| About |
|---|
| Product Description | |
|---|---|
| Generic | CPVC |
| Material Status | Commercial: Active |
| Availabilitys | North America,Asia Pacific,Latin America,Europe,Africa & Middle East |
| Process Methods | Extrusion |
| Technical Data | |||
|---|---|---|---|
| PHYSICAL | Nominal value | Unit | Test method |
| Density | 1.46 | g/cm³ | ASTM D792 |
| PVC unit classification | 23447 | ASTM D1784 | |
| IMPACT | Nominal value | Unit | Test method |
|---|---|---|---|
| Impact strength of cantilever beam notch | |||
| 23℃,3.2mm | 80 | J/m | |
| 23℃,3.2mm | 85 | J/m | |
| Falling impact resistance | |||
| 23°C,1.93 mm | 47.2 | J/cm | |
| 23°C,1.93 mm | 108 | J/cm |
| THERMAL | Nominal value | Unit | Test method |
|---|---|---|---|
| Hot deformation temperature | |||
| 0.45 MPa, unannealed | 102 | ℃ | |
| 0.45 MPa, annealed | 108 | ℃ | |
| 1.8 MPa, unannealed | 92.8 | ℃ | |
| 1.8 MPa, annealed | 104 | ℃ | |
| Linear coefficient of thermal expansion | |||
| MD | 6.7E-5 | 1/℃ | ASTM D696 |
| MECHANICAL | Nominal value | Unit | Test method |
|---|---|---|---|
| Shore hardness | |||
| Shaw’s D | 84 | ||
| Shore D, 15 seconds | 81 | ||
| Rockwell hardness | 117 | ASTM D785 | |
| Tensile modulus | |||
| 23℃ | 2650 | MPa | ASTM D638 |
| Tensile strength (yield, 23 ° C) | 53.6 | MPa | ASTM D638 |
| Bending modulus | |||
| 23℃ | 2760 | MPa | ASTM D790 |
| bending strength | |||
| Yield, 23 ℃ | 91.0 | MPa | ASTM D790 |
| Process Conditions | |||
|---|---|---|---|
| extrusion | Nominal value | Unit | Test method |
| Melt Temperature | 198 to 206 | °C | |
| Notes |
|---|
| 【 Disclaimer 】 Guangzhou Soliao Information Technology Co., Ltd. reserves all rights. The information in this data table was obtained from the manufacturer of the material on soliao.com. Soliao.com makes every effort to ensure the accuracy of this data. However, the search company does not assume any responsibility for the uncertainty and consequences caused to users by these data values and suggestions, and strongly recommends verifying the data values with the material supplier before the final selection of materials. |