RTP 4202

About
Warning: The status of this material is ‘Commercial: Limited Issue’ The data for this material has not been recently verified. Please contact RTP Company for current information prior to specifying this grade.&&

Product Description
GenericTPI
Material StatusCommercial: Negative
FeaturesV-0
AvailabilitysAfrica & Middle East ,North America,Latin America,Asia Pacific,Europe
Process MethodsInjection Molding

Technical Data
PHYSICALNominal valueUnitTest method
Density1.45g/cm³ASTM D792
Shrinkage rate
MD: 3.2 mm, injection molded1.1%ASTM D955
Water absorption rate
23℃,24hr0.14%ASTM D570

IMPACTNominal valueUnitTest method
Impact strength of cantilever beam notch
3.2mm, injection molded80J/mASTM D256
Notched impact strength of cantilever beam
3.2 mm690J/mASTM D4812

THERMALNominal valueUnitTest method
Hot deformation temperature
1.8 MPa, unannealed, injection molded282ASTM D648

FLAME CHARACTERISTICSNominal valueUnitTest method
Flame retardant level
1.50 mmV-0 UL 94

MECHANICALNominal valueUnitTest method
Rockwell hardness
R-level126 ASTM D785
Tensile modulus
injection molding7580MPaASTM D638
tensile strength141MPaASTM D638
Tensile strain
Yield, injection molding3.2%ASTM D638
Bending modulus
injection molding6890MPaASTM D790
bending strength
injection molding234MPaASTM D790

Process Conditions
injectionNominal valueUnitTest method
Barrel rear temperature371 to 410°C
Barrel middle temperature371 to 410°C
Barrel front temperature371 to 410°C
Mold temperature177 to 232°C
Injection pressure138 to 193MPa

Notes
1. Typical properties: these are not to be construed as specifications.
【 Disclaimer 】
Guangzhou Soliao Information Technology Co., Ltd. reserves all rights. The information in this data table was obtained from the manufacturer of the material on soliao.com. Soliao.com makes every effort to ensure the accuracy of this data. However, the search company does not assume any responsibility for the uncertainty and consequences caused to users by these data values and suggestions, and strongly recommends verifying the data values with the material supplier before the final selection of materials.